|
|
 |
Animation
Photo Credits Attributed to NASA/The Johns Hopkins University Applied Physics Laboratory (JHU/APL)
Rotation
| Note: You will need special software to view these files. If you do not
already have QuickTime installed, you can download it from www.quicktime.com.
Microsoft's MediaPlayer
can be used to view MPEG files. Additional MPEG players can be found at www.mpeg.org. |
During the first 30 days after launch, the TIMED spacecraft and its instruments
are turned on and fully checked out. TIMED's Mission Operations personnel will
also begin testing the movement of the solar panels and verifying their power
levels. Once the check-out process is complete, the spacecraft is declared operational
and its science operations begin.
|
|
|