ACE/ULEIS instrument event table Dec 15, 2004 Listing of ULEIS states, etc. Times are from data files & logs 8/29/97 1997-241 15:55 ULEIS DPU on 8/29/97 1997-241 16:13 first data 8/29/97 1997-241 16:40 HV to command level 50, 50, 50 8/29/97 1997-241 16:45 "long calibrate" started 9/2/97 1997-245 20:20 end calibrate; ramp hv (to ?) 9/3/97 1997-246 17:35 lower small SSD threshold to 2.254 9/3/97 1997-246 18:56 close door to 25% setting 9/4/97 1997-247 16:25 - 20:10 mode change & HV adjust to 140-140-140 then to 140-155-155 9/9/97 1997-252 19:25 ULEIS trips off due to "autonomy" bit setting due to motor current exceeding software limit 9/9/97 1997-252 19:35 ULEIS restarted, HV now at 0-0-0 9/10/97 1997-253 16:28 HV to 140-170-170 9/10/97 1997-253 16:43 shutter closed, alpha run at 140-170-170 9/11/97 1997-254 12:40 drop in most rates - cause? 9/11/97 1997-254 18:21 HV to 150-180-180, alpha run continues 9/12/97 1997-255 16:28 shutter opened; HV @ 150-180-180 9/12/97 1997-255 18:00 HV @ 64-64-64 for S/C burn 9/25/97 1997-268 15:31 ULEIS to 150-180-180 10/17/97 1997-290 14:10 ULEIS D4 turned off 10/17/97 1997-290 14:30 - 15:01 ULEIS door exercised; alpha source seen 12/5/97 1997-339 21:30 ULEIS HV to 2400V (64-64-64?) 12/18/97 1997-352 17:54 ULEIS HV to 140-170-170 ULEIS D1 turned off 2/17/98 1998-048 17:00 - 19:00 BAndrews cmd session; data may be garbled 2/18/98 1998-049 13:40 - 17:20 load ROM table #2 3/12/98 1998-071 14:00 ULEIS off for new priority flight code load 3/14/98 1998-073 15:45 ULEIS back in operation: 140-170-170; D1,D4 off 4/21/98 1998-111 14:57 ULEIS Start-2 wedge HV to 0: 140-0-170; D1,D4 off 4/27/98 1998-117 16:15 ULEIS Start-2 wedge HV on: 140-170-170; D1, D4 off 6/10/98 1998-161 16:50 ULEIS off for possible C&DH reset problem 6/16/98 1998-167 16:35 ULEIS back on (incl HV); D1, D4 off 7/27/98 1998-208~15:00 ULEIS Start-1 HV to 0; switch matrix rates to TOF2 8/4/98 1998-216~15:30 ULEIS Start-HV to 140-170-170, matrix rates on TOF2 8/14/98 1998-226 16:12-17:30 Load TOF-2 boxes into EEPROM 8/15/98 1998-227 14:20-15:00 load new tof-2 rom boxes; tof2 trigger 9/25/98 1998-268 15:35 ULEIS Start-1 HV to 0 10/5/98 1998-278 13:45 ULEIS Start-1 HV to 140 11/3/98 1998-307 20:05 ULEIS cover to 25% position for test 11/3/98 1998-307 20:25 ULEIS cover returned to fully open position 11/13/98 1998-317 14:15 ULEIS cover to calibrate position - alpha run 11/13/98 1998-317 15:00 ULEIS HV off for Leonid shower 11/20/98 1998-324 19:10 ULEIS HV to 140-170-170; shutter closed alpha run 11/21/98 1998-325 16:45 ULEIS cover open 2/2/99 1999-033 16:30 ULEIS Start 1 HV to 150; HV setting 150-170-170 2/16/00 2000-047 18:15 ULEIS HV ramp down for maneuvering burn 2/18/00 2000-049 14:45 ULEIS HV ramped back up to 150; 4/3/00 2000-094 09:52 ULEIS TOF-1 anomaly onset 4/17/00 2000-108 16:29 begin "short format" calibrate mode 4/18/00 2000-109 16:31 end short format calibrate mode 4/18/00 2000-109 16:35 HV 1 to 165 4/18/00 2000-109 17:33 HV 1 to 0 4/19/00 2000-110 16:35-16:56 HV-1 to 165 by several steps 4/20/00 2000-111 14:27 door to 25% open setting 4/20/00 2000-111 14:32 door to 100% open setting 4/20/00 2000-111 14:36 door to 25% open setting 4/20/00 2000-111 14:40 door to 100% open setting 4/20/00 2000-111 14:47 ULEIS Start 1 HV to 170; HV setting now 170-170-170 4/20/00 2000-111 15:02 ULEIS Start 1 HV to 175; HV setting now 175-170-170 4/20/00 2000-111 15:17 ULEIS Start 1 HV to 180; HV setting now 180-170-170 4/21/00 2000-112 15:07 ULEIS Start 2 HV to 0; HV setting now 180- 0-170 4/21/00 2000-112 15:44 begin ramp-up of Start 2 HV 4/21/00 2000-112 15:57 ULEIS Start 2 HV at 170; HV setting now 180-170-170 4/25/00 2000-116 15:07 start "long format" calibrate mode 4/26/00 2000-117 14:37 ULEIS AE box OFF 4/26/00 2000-117 14:53 ULEIS -- turn on AE box & start HV ramp-up 4/26/00 2000-117 16:27 ULEIS turn on finished; HV setting now 180-170-170 4/27/00 2000-118 reset calibrate "on" bit 5/04/00 2000-125 15:24-17:30 "long format" calibrate mode 6/09/00 2000-161 15:00 ULEIS Start 1 HV to 150; HV setting now 150-170-170 6/19/00 2000-171 16:00 ULEIS Start 1 HV to 0; HV setting now 0-170-170 9/12/00 2000-256 14:40 ULIES Start 1 to 150 as test; HV now 150-170-170 9/13/00 2000-257 14:00 ULIES Start 1 to 0 HV setting now 0-170-170 10/23/00 2000-297 15:58 ULEIS Start 2 to 180 HV setting now 0-180-170 11/09/00 2000-314 16:27 door to 6% open setting 11/10/00 2000-315 17:15 door to 100% open setting 03/01/01 2001-060 10:05:00 automatic door control turned on (failed) 03/01/01 2001-060 11:20:00 reopen door (manually) 04/03/01 2001-093 16:13:00 door to 6% open setting 04/09/01 2001-099 14:05:00 door to 100% open setting 04/11/01 2001-101 15:29:00 door to 6% open setting 04/18/01 2001-108 17:15:00 door to 100% open setting 07/23/01 2001-204 14:25:00 automatic door control turned on 08/08/01 2001-220 14:50:00 automatic door control turned off (HK spikes) 09/10/01 2001-253 16:20:00 automatic door control turned on (after mods) 10/09/01 2001-282 17:25:00 ULEIS inadvertently commanded off 10/10/01 2001-283 22:10:00 ULEIS return to pre-shutdown operating state 10/19/01 2001-292 13:58 - 14:40 ULEIS out of science mode 10/26/01 2001-299 16:15:00 ULEIS begins autonomous shutter motion 11/15/01 2001-319 16:34:00 shutter motion threshold adjusted (incorrectly) 11/16/01 2001-320 13:56:00 shutter motion trigger level increased by 4x 01/08/02 2002-008 15:30:01 ULEIS Start 2 to 185 HV setting now 0-185-170 04/15/02 2002-105 15:56-16:20 TOF-1 aliveness test (negative result) 11/03/04 2004-308 16:42-16:55 dump mode (out of science mode) 12/10/04 2004-345 13:06:33 load priority table v2 into RAM